Pouring the basement floor

floor1.jpg (263018 bytes)floor2.jpg (221776 bytes)floor3.jpg (234528 bytes)floor4.jpg (146743 bytes)floor5.jpg (148886 bytes)

Pouring the floor and keeping it level is the trick. On the right we level between stakes driven in the ground and level from there to marks on the side wall.

floor6.jpg (252375 bytes)floor7.jpg (120275 bytes)floor8.jpg (141107 bytes)floor9.jpg (137240 bytes)floor10.jpg (92601 bytes)

Next we finish the concrete working from nee boards.