Pictures of the framing of the new lake front floors

lframe1.jpg (52209 bytes)lframe2.jpg (64559 bytes)lframe3.jpg (42579 bytes)lframe4.jpg (61253 bytes)lframe5.jpg (43608 bytes)

Framing and steps on the new lake front floors.

lframe6.jpg (72436 bytes)lframe7.jpg (97552 bytes)lframe8.jpg (85153 bytes)lframe9.jpg (77213 bytes)lframe10.jpg (84931 bytes)

Now we can get the roof tied together and new singles.

lframe11.jpg (55292 bytes)lframe12.jpg (69590 bytes)lframe13.jpg (66278 bytes)lframe14.jpg (51177 bytes)lframe15.jpg (53677 bytes)

Hey, I can do this (level the driveway).

Get the furnace and air hooked back up.

New windows and doors.

N-ice cold view.