Forming and pouring the walls by Adam's Poured Walls.
The forms were wood this time.
Pumping the concrete under the old house.
Twelve foot high walls. 200 yards of concrete so far.
The columns holding up the second floor are poured into the walls.
Putting down the Vulcraft metal for the lake side floors.
Pouring the lake side floors.